Opportunity Assessment

The positive side of risk: list the good things that might happen, rate how likely and how beneficial each one is, and decide which are worth chasing.

Start an opportunity assessment Free template · no account needed

Most teams keep a list of what could go wrong. Very few keep a list of what could go right, and so the lucky breaks arrive unprepared for: the big customer who shows interest, the supplier offering a discount, the deadline that could be beaten.

An opportunity assessment treats those the way a risk analysis treats threats. Uncertain events with a positive effect get identified, rated and given an owner, so that good luck becomes something you plan for.

What is an opportunity assessment?

It’s a risk matrix turned around. Risk standards define risk as the effect of uncertainty on objectives, and that effect can be positive as well as negative. A positive risk is an opportunity: something that may or may not happen, and that would help if it did.

The assessment answers three questions for each one:

  1. What might go better than planned? Opportunity identification.
  2. How likely is it? Probability.
  3. How much would it help? Benefit.

Opportunities that score high on both deserve active work to make them happen. The rest are noted and left alone.

The two scales

The FreeAssess template uses five levels on each axis, the same shape as its risk matrix:

  • Probability Rare, Unlikely, Possible, Likely, Almost certain. How likely the opportunity is to happen if you do nothing special.
  • Benefit Negligible, Minor, Moderate, Major, Exceptional. How much it would help the objective if it happened.

The grid is colored by the product of the two positions, from green through amber to red, so only opportunities that are high on both get hot. Results rank the hottest first. Agree up front what each benefit level means in your own terms, for example in money, weeks saved or customers won.

Try it: opportunities in a product launch

Two opportunities are rated. Place the others, and watch how the reading changes as you move them across the grid.

How likely, and how beneficial?

Interactive example

Drag an item onto the grid, or select it and then click a square. With the keyboard, focus an item, move it with the arrow keys, and press Delete to take it off the grid.

To place
What the grid says
  1. Main competitor delays its release Medium Take a cheap step to improve the odds.
  2. Supplier offers a volume discount Medium Take a cheap step to improve the odds.
  3. Pilot customer agrees to a case study Not placed yet
  4. Launch is ready two weeks early Not placed yet
  5. Conference talk is accepted Not placed yet
  6. A new grant program opens Not placed yet

Reading the corners. Because the coloring multiplies both positions, anything in the lowest row or column stays green. A rare opportunity with an exceptional benefit can still be worth a small bet, so look at that corner by hand.

How to run it

  1. Identify opportunities. Ask the team what could go better than planned. Reading the risk register backwards helps: the opposite of a risk is often an opportunity.
  2. Define the scales. Say what Major and Exceptional mean for this project before anyone rates.
  3. Rate independently. Each person places every opportunity on the grid. Optimists and skeptics balance each other out in the average.
  4. Choose a response. Project management practice names five for opportunities: exploit (make sure it happens), enhance (raise the probability or the benefit), share (bring in a partner who can capture it), escalate (pass it to someone with the authority to act on it) or accept (take it if it comes).
  5. Assign owners. Every opportunity you decide to exploit or enhance needs a name and a next step.

Give the upside a place on the agenda.

Rate opportunities together in the same session as your risks. The combined picture forms as the answers come in.

Start opportunity assessment free template

Where is it used?

  • Project risk management A complete risk register lists opportunities next to threats.
  • Strategy reviews Rating the opportunities from a SWOT analysis to see which deserve investment.
  • Sales and partnerships Comparing deals and alliances that may or may not come through.
  • Product planning Weighing market openings before committing a roadmap slot.
  • Grants and tenders Choosing which applications are worth the effort of bidding.

Advantages and disadvantages

Advantages

  • Balances the picture. A register with only threats makes every project look worse than it is.
  • Familiar format. Anyone who has seen a risk matrix can use it straight away.
  • Prompts action. A hot opportunity without an owner is easy to spot.
  • Quick. A workshop is enough; no financial model is needed.

Disadvantages

  • Optimism bias. People overrate the odds of things they hope for. Rate independently and compare.
  • Coarse scales. Five levels can’t separate a good opportunity from a great one.
  • No cost side. The grid shows the benefit, not what it takes to capture it. A value × effort matrix adds that.
  • Goes stale. Windows open and close. Review it as often as the risk register.

Background

Risk management long meant avoiding losses. That changed as the standards matured: ISO 31000, first published in 2009 and revised in 2018, defines risk as the “effect of uncertainty on objectives” and notes that the effect can be positive, negative or both. The Project Management Institute’s PMBOK Guide takes the same view and describes response strategies for opportunities alongside those for threats; escalation was added to both lists in its sixth edition in 2017. The probability and benefit matrix is the natural counterpart of the probability and impact matrix those standards use for threats.

Related models

Don’t leave the upside to chance

Rate your opportunities together and agree which ones get an owner.

We use cookies to improve your experience, analyze traffic, and serve personalized ads. Read more in our Cookie Policy.